Place of Origin: | China |
---|---|
Brand Name: | JIN MENG |
Certification: | ISO9001 |
Model Number: | JMD650 |
Minimum Order Quantity: | 1set |
Price: | $800000-$1400000 |
Packaging Details: | Bulk |
Delivery Time: | 120days |
Payment Terms: | ,T/T |
Supply Ability: | 10sets/year |
Name: | Heavy Equipment Bucket Wheel Dredger | Type: | Bucket Wheel Dredger |
---|---|---|---|
Condtional: | Brand New | Engine Brand: | Cummins/ MITSUBISHI |
Discharge Distance: | 3000m | Pump Capacity: | 1000m3/h |
Hydraulic System: | Rexroth | Dredging Depth: | Up To 20 Meters |
Engine: | Cummins/ Mitsubishi | Warranty: | One Year |
Highlight: | cummins bucket wheel dredger,rexroth bucket wheel dredger,cummins 3 in 1 dredger |
Attribute | Value |
---|---|
Name | Heavy equipment bucket wheel dredger |
Type | Bucket wheel dredger |
Condition | Brand new |
Engine Brand | Cummins/MITSUBISHI |
Discharge Distance | 3000m |
Pump Capacity | 1000m3/h |
Hydraulic System | Rexroth |
Dredging Depth | Up to 20 meters |
Warranty | One year |
Weifang Jin Meng Dredger Co., Ltd. is a leading Chinese manufacturer specializing in heavy equipment bucket wheel dredgers for river channel, canal, and water storage dredging applications. Our dredgers combine hydraulic control with modular assembly for optimal performance and transportability.
Located in Qingzhou, Weifang City, Shandong Province, we maintain strategic partnerships with renowned dredger design institutes in China. Our facilities include:
Dredging Pump Discharge Pipe | 650mm |
Head | 65m |
Max. Working Capacity | 1100m3/h |
Discharge Distance | 4000m |
Dredging Depth | 18m |
Diesel Engine | 1885KW (Mitsubishi) |
Hydraulic Auxiliary Engine | 522KW (Cummins) |
Total Power | 2437KW |
Oil Consumption | 365L/H |
Hull Dimensions (L×W×D) | 50m × 8.8m × 2.5m |
Every dredger undergoes comprehensive factory testing before delivery. Clients are invited to inspect performance prior to shipment, ensuring operational readiness at their worksites.
We provide two experienced engineers for on-site assembly assistance and operator training. With proper ancillary equipment, assembly can be completed within 10 days, followed by one week of training.