Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Brand Name: | Jin Meng |
---|---|
Certification: | ISO |
Model Number: | JMD550 |
Minimum Order Quantity: | 1 set |
Price: | $800000-$1200000 |
Packaging Details: | Bulk |
Delivery Time: | 100days |
Payment Terms: | T/T |
Supply Ability: | 10sets/year |
Discharge Distance: | 2.5 Kilometers | Warranty: | One Year |
---|---|---|---|
Control: | SIEMENS PLC | Suction Pipe Diameter: | Up To 600 Mm |
Dredging Pump Type: | Shijiazhuang | Pump Type: | Centrifugal Pump |
Cutter Head Power: | 272HP | Cutter Diameter: | 1700 Meters |
Type: | Cutter Suction Dredger With Submersible Pump | ||
Highlight: | Centrifugal Pump Dredging Ship,Large-Scale Dredging Ship,River Desilting Dredging Ship |
A dredging ship is a specialized vessel designed for various types of dredging operations, such as maintenance dredging, environmental dredging, and mining dredging. This versatile ship is equipped with powerful machinery and equipment to remove sediment and debris from the seabed, riverbed, or any underwater area.
The Cutter Dredging Ship is an essential tool for cutting and breaking through hard surfaces underwater, such as rock, clay, or compacted soil. With its robust cutting mechanism, this ship can efficiently excavate and dredge challenging materials, ensuring smooth and effective dredging operations.
Equipped with a Siemens PLC control system, the Dredging Ship offers advanced and precise control over its operations. The Siemens PLC ensures seamless automation and monitoring of various dredging processes, enhancing efficiency and accuracy in dredging activities.
All dredging ship design, construction, quality inspection is according to the standards and regulations of CCS.
The steel plates are CCSB plates which meet the requirements of CCS.
The welders are skillful and experienced and certified under the regulations of CCS.
Anti-corrosion paints material is marine use under the requirements of CCS.
The installation concentricity of dredging ship diesel engine is less than 0.05mm.
Above regulations is the core guarantee to dredging ship quality.
With a warranty of one year, the Dredging Ship offers reliability and assurance of quality performance. The one-year warranty provides peace of mind to users, ensuring that any potential issues or defects will be promptly addressed and resolved, enhancing the overall reliability and longevity of the dredging ship.
JMD550D 22inch River desilting dredging ship | |||
Shijiazhuang Dredging Pump |
Dia. Discharge pipe | 550mm | |
Head | 80m | ||
Max. Working capacity | 1050m3/h | ||
Discharge distance | 3500m | ||
Dredging depth | 25m | ||
Diesel Engine | 1306KW | Cummins | |
Hydraulic Auxiliary engine | 336KW | Cummins | |
Submersible pump generator | 746KW | Cummins | |
Emergency Generator | 30KW | Cummins | |
Total power | 2418KW | ||
Oil Consumption | 360L/H | ||
Hull Dismension | L*W*D | 56m×8.5m×2.5m | |
Hydraulic system | Hydraulic pump | VICKERS America (Joint-venture) | |
Hydraulic Motor | Italy SAI technology(Joint-venture) | ||
Valves | REXROTH Germany (Joint-venture) | ||
Operating system | SIEMENS PLC(Imported from Germany) | ||
Ladder winch | Tension | 200KN | |
Swing winch | Tension | 120KN | |
Cutter Head | Crown-like | Φ1800mm | |
Power | 200KW |
The Jin Meng JMD550 dredging ship is a reliable and efficient solution for various dredging applications. With its origins in China, this cutter suction dredging ship offers a powerful performance that can handle a wide range of dredging tasks.
One of the key features of the Jin Meng JMD550 dredging ship is its impressive suction pipe diameter of up to 600mm, allowing it to effectively remove large volumes of sediment and debris from the seabed or riverbed. The diesel-powered engine provides the necessary drive power to operate the dredger ship efficiently.
Equipment on dredging ship are as bellows: traversing device, cutter ladder lifting device, spuds and deck crane.
The dredging ship working process is as following: the cutter head cut the sand underwater to mixture of slurry, then through dredging pump to the pipeline; at the end of the slurry will be discharged by pipeline on land to the required place.
Functions of dredging ship: river dredging, desilting, reclamation for channels and land, especially for sand dredging in river, salty water or peaciful sea.
Whether it's dredging harbors, rivers, or lakes, the Jin Meng JMD550D dredging ship is designed to deliver high performance in various dredging scenarios. Its robust construction and advanced features make it suitable for demanding dredging tasks, providing a versatile solution for dredging companies and marine contractors.
Backed by a one-year warranty, customers can have peace of mind knowing that the Jin Meng JMD550D dredging ship is a durable and dependable investment for their dredging operations.
Our product customization services for the cutter suction dredging ship include:
- Brand Name: Jin Meng
- Model Number: JMD550
- Place Of Origin: China
The dredging ships can be custom made according to customers’ requirements:
1. Anchor booms installation
2. Spud carriage
3. Dredging ship position of 5 anchors.
4. Hydraulic driving for spud flat down(to pass and transport on water safely).
5. Make the dredging ship with extra dredging pump underwater to deepen dredging depth for 20-30m underwater and slurry concentration is more than 30%.
6. Make the dredging ship with booster station to further the discharge distance.
The Product Technical Support and Services for the Dredging Ship include:
- On-site installation assistance
- Training for crew members
- Maintenance and repair services
- Remote technical support
- Spare parts supply
1) Party A will send 2 qualified and experienced engineers to Party B's workplace to direct and guide the dredging ship's installation and training operating, if needed. .
2) To assist in the installation; Party B will arrange for 6-8 workers to aid these engineers.
3) Installation and test period is expected to take 10-15days for one dredging ship with full ready of installation.
4) Party A's engineers must arrive at Party B's designated place within 3 days after the dredging ship has been transported to the workplace.
5) After the dredging ship's complete installation, Party B Can coordinate Party A's engineers to test dredging ship's performance in appropriate water. Dredging ship test includes: operation of the dredging, hydraulic and electrical systems, running of the dredging ship's outfitting equipment, and Party A's engineers' debugging of the dredging ship's natural work.
Product Packaging and Shipping:
Our Dredging Ship product is carefully packaged to ensure safe delivery to our customers. The ship is securely wrapped and protected to prevent any damages during transportation.
For shipping, we partner with reliable carriers to deliver the product to your location in a timely manner. We strive to provide efficient shipping services to ensure that your Dredging Ship reaches you promptly and in perfect condition.
Weifang Jin Meng Dredger Company Factory and Workshop
JMD550D 22inch river desilting dredging ship under production
JMD550D River desilting dredging ship in working site dredging depth 20m
JMD550D 22inch river desilting dredging ship installation and training
Welcome visit our factory for more JMD550D river desilting dredging ship details