Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | China |
---|---|
Brand Name: | JIN MENG |
Certification: | ISO9001 |
Model Number: | JMD550 |
Minimum Order Quantity: | 1 |
Price: | $300000-$800000 |
Packaging Details: | Bulk |
Delivery Time: | 30days |
Payment Terms: | T/T |
Supply Ability: | 10sets/year |
Name: | River Desilting Cutter Suction Dredger | Type: | Hydraulic Cutter Suction Dredger |
---|---|---|---|
Function: | River, Sea, Lake,pond Dredging | Water Flow: | 4000m3 |
Depth: | 15m | Distance: | 2500m |
Enigne: | Cummins | Power: | 1662kw |
Hydraulic Valve: | Rexroth | Control: | SIEMENS PLC |
Delivery: | 30days | ||
Highlight: | River Desilting cutter suction dredge,SIEMENS PLC cutter dredger,4000m3 sand dredging boat |
River Desilting Cutter Suction Dredger
1.Company Introduction
Dredger manufacturer Weifang Jin Meng Dredger Co.,Ltd. located in Qingzhou, Weifang City, Shandong Province is a supplier in China, and we have been specialized in river desilting cutter suction dredger manufacturing since 2000. Our river desilting cutter suction dredgers have a good price advantage and cover most of the African, Middle East, South East Asian and South American and American markets. We look forward to becoming your long-term partner in China.
2. Weifang Jin Meng River Desilting Cutter Suction Dredger Description
The river desilting cutter suction dredger we manufacture is self-propelled or non self-propelled,portable river cutter suction dredger. The hull uses dismantle and box-like structure, Its dismantle type can be assembly at working place easily and be transported by road, railway and container accordingly, convenient in installation and working place moving from one to another. The power system can be designed to electric system or diesel engine driving system according to customers’ requirements.Equipment on the river desilting cutter suction dredger are as bellows: traversing device, cutter ladder lifting device, spuds and deck crane. The working process is as following: the cutter head cut the sand and mud underwater to mixture of slurry, then through dredging pump to the pipeline on river desilting cutter suction dredger; at the end the slurry will be discharged by pipeline on land to the required place.
3. Weifang Jin Meng River Desilting Cutter Suction Dredger Technical Specifications
JMD550 River Desilting Cutter Suction Dredger | |||
KINDA Dredging Pump |
Dia. Discharge pipe | 550mm | |
Head | 65m | ||
Max. Working capacity | 900m3/h | ||
Discharge distance | 3000m | ||
Dredging depth | 14m | ||
Diesel Engine |
1306KW | Cummins | |
Hydraulic Auxiliary engine | 336KW | Cummins | |
Emergency Generator | 20KW | WEICHAI | |
Total power | 1662KW | ||
Oil Consumption | 250L/H | ||
Hull Dismension | LOA*W*D | 42m×7.5m×2.0m | |
Hydraulic system | Hydraulic pump | VICKERS America (Joint-venture) | |
Hydraulic Motor | Italy SAI technology(Joint-venture) | ||
Valves | REXROTH Germany (Joint-venture) | ||
Operating system | SIEMENS PLC(Imported from Germany) | ||
Ladder winch | Tension | 120KN | |
Swing winch | Tension | 120KN | |
Cutter Head | Crown-like | Φ1800mm | |
Power | 200KW |
4. Weifang Jin Meng River desilting Cutter Suction Dredger Feature and Application
River desilting cutter suction dredger can pass low bridge easily, the controlling room and rest room are dismountable. Connecting parts for cabin room and deck are easily dismounted joints,.
Construction: it consists of three pontoons: one main pontoon and two side pontoons. The pontoons are connected by the connecting pieces and tightened by high intensity bolts and nuts.
Working site of river desilting cutter suction dredger: sea, port, lake, and river.
Soil conditions: relative hard soil, harden sand, sludge, sea sand, river sand, clay, mud, and so on.
5. Weifang Jin Meng River Desilting Cutter Suction Dredger Details
Detachable Structure
The river desilting cutter suction dredger is detachable, so it is easy to transport when delivering or moving from one working site to another.
Shijiazhuang Pump
Flow passage components use High wear resistant alloy Cr27 to prolonged the pump service life, pump shaft seal use packing seal which is easy to maintain , and anti-friction bearings are from Japanese brand NSK.
Cutter head
For one cutter head, there are 5 blade, 8 teeth equipped on one blade. There is material High chromium. for easy-wearing proof.
Cutter head is driven by hydraulic motor; cutter bearing has lubrication seal-in units.
6. Weifang Jin Meng river desilting cutter suction dredger After Sales Installation
1) Party A will send two qualified and experienced engineers to Party B's workplace to direct and guide the river desilting cutter suction dredger's installation and training operating, if needed. .
2) To assist in the installation; Party B will arrange for 6-8 workers to aid these engineers.
3) Installation and test period is expected to take 10-15days for one dredger with full ready of installation.
4) Party A's engineers must arrive at Party B's designated place within 3 days after the dredger has been transported to the workplace.
5) After the dredger's complete installation, Party B Can coordinate Party A's engineers to test dredger's performance in appropriate water. Dredger Test includes: operation of the dredging, hydraulic and electrical systems, running of the dredger's outfitting equipment, and Party A's engineers' debugging of the dredger's natural work.
Please feel free to contact